The second concrete pour has almost been completed. It had to be poured in stages as finishing along the shelving rails had to be carefully troweled by hand. There is one section that is left to be poured to complete the floor. Then the stairs to the mezzanine, the mezzanine floor, and the accessibility ramp that adjoins the two facilities will be poured. Next week, the folks from Spacesaver shelving will be back on site to install the mobile shelves. That will take about a month to complete. We've gone from snow on the ground just a few weeks ago straight into summer temperatures - so the ground has thawed and the mud has dried up and we can shortly turn our attention to finishing up the exterior of the building and landscaping.
No comments:
Post a Comment