Construction is finally winding down. All that remains for the outside of the building is a rail for the wheelchair ramp and some landscaping, which will commence the first full week of September when summer temperatures have leveled off. There are still a few finishing touches to be done inside the facility - wall paneling to be installed, doors to be stained, baseboards finished. We are excited to start the installation of our RFID tracking system in the fall, supplied by OCR. During the weekend of September 16-18th, the Museum of Ontario Archaeology will be hosting their annual Harvest Festival. The event coincides with Doors Open London, in which both the museum and the Sustainable Archaeology Center will open their doors to the public during that weekend.