It's been a while since we've shown the front of the Sustainable Archaeology facility. You can see the new entrance foyer (with the overhang) and the 'windows' that have been installed on the repository. The braces for the new siding are being installed and siding should start going up any day. Inside, the walls have been white-washed with primer in preparation for the new paint. Next week, the old entrance to the museum will be repaired, the new ramp will be constructed and the lobby/giftshop area of the museum will undergo some renovations in order to provide a consistent look between the two facilities.
No comments:
Post a Comment